Disassembly, cleaning, inspection and full dimensional checks.
- NDT inspection (MPI; FPI and X-ray) as required by Dresser-Rand specifications.
- Submission of an Inspection Disposition Report (IDR) to the client.
- Product upgrades are incorporated to match current standard production design for enhanced reliability and maintainability during the next duty cycle.
Gas Turbine Rotor Overhaul for KG2
Overhaul of the engine static parts can be carried out in Dresser-Rand authorized repair centers around the world, at the client’s convenience. In this case, the rotor is sent for overhaul at the Kongsberg repair center and reinstalled in the engine prior to delivery to the client.
- Full load Factory Acceptance Test (FAT) in a production test cell (waterbrake) to verify mechanical integrity and performances. The acceptance criteria are identical to current new engine production FAT.